NOBLE TERRACE
August 15, 2024 Our engineer is working of the final design stages of the project. Then, DEC will evaluate the design and issue appropriate permitting. UPDATE: April 16, 2024 We have received a Professional Engineering Report about the Noble Terrace Bridge. The Town Board will be reviewing the document, and discussing the options further. Noble…
GARBAGE DISTRICT
As of January 1, 2025, Transfer Station Dump stickers will increase in price. The NEW cost is: GREEN $3, ORANGE/RED $6
FOOTBRIDGE 2024
UPDATE 3/12/2024: THE ENGINEER ASSESSED THE FOOTBRIDGE TODAY. HE HAS CLEARED US TO DO THE NECESSARY WORK TO UPKEEP THE BRIDGE. IT IS CURRENTLY SAFE TO USE. The Footbridge walking bridge is currently CLOSED to all traffic, pedestrian or otherwise. There have been structural findings that need to be addressed. Please check back for updates….